Site Loader

Planning to remodel your kitchen? Well, you might be wondering how long does it take to remodel a kitchen? To find out different time estimates for kitchen remodeling, then keep on reading.

Depends On The Project

There is no particular time frame for any type of remodeling project. Things are going to take place at a different pace, the companies doing the remodeling might have different speeds at which they work and it also depends on the type of remodeling you are going for. It might be only a couple of things you are changing, or it can be a full-blown kitchen remodel where everything is being changed and replaced.

Here are the time frames for different types of remodeling projects. These will give you a good estimate of how long each project will take.

Full Kitchen Remodel

This project involves a whole kitchen makeover. If you are not happy with an already existing kitchen, or it’s high time you change things around the kitchen then this is the type of remodeling. A full kitchen remodeling project will take anywhere from 4 to 6 months to complete. This remodeling project will include changing the countertops, floors, cabinets, and even the piping underneath the floors.

Everything will be flipped over and replaced with new things. This type of remodeling is done when your kitchen is in dire need of some change and there are issues with things like the gas piping in the stovetop, the water pipes, and even the stove exhaust system.

Changing Cabinets

If you only want to change the cabinets of the kitchen, then this will be a much smaller kitchen remodeling project. This will take roughly 2 to 3 weeks, if not even less. It depends on the workforce as well and how fast and efficiently they are working. The cabinets need to be removed first and then new ones can be installed if you have the material and design selected and ready to go. Even the structural change of the cabinets will not take longer than 3 to 4 weeks, and your kitchen will be usable during this time as well.

Changing The Floors

If the floors of your kitchen need a makeover, then you will need to allocate about 1 to 2 weeks for the floors to be installed. This is also a very small remodeling project and it depends on how big your kitchen is. The floor span will determine how long it will take to install the new flooring. It shouldn’t take more than 3 weeks to be installed, however, if you have the material and type of flooring selected already.

Your kitchen, however, will not be usable until the floors are installed, so you will need to think about an alternative cooking space for some time.

Changing The Countertops

The countertops can also be in need of a change. This is also a really short remodeling project. It takes about 2 to 4 weeks for everything to be installed from start to finish. The kitchen will not be usable for this time, so thinking about a different temporary kitchen beforehand will save you a lot of hassle.

While you’re at it, you can also have a backsplash installed on the back of your sink walls for a beautiful look.

Adding New Fixtures And Faucets

Your sink and taps can only last for so long and after some years, they might be in need of a change. This type of remodeling project only takes days to complete, if not 1 to 2 days. Fixtures and faucets are easy to install and the only involved part of this whole remodeling project is the purchasing of these faucets because you want to select certain designs and shapes.

As long as installation goes, it doesn’t take longer than a few days to get it fixed and ready for daily use.

Conclusion

There you have it! Every kitchen remodeling project is different and it will take a certain amount of time for each project to be completed. It solely depends on how much work needs to be done. You should look for an experienced kitchen remodeling contractor Rockville to have your kitchen renovated on time. Moreover, experienced professionals make sure that the project is done as instructed without cutting corners and skipping details.

Gabby

Leave a Reply

Your email address will not be published. Required fields are marked *